Sewage treatment plants reduce energy costs

 Sewage treatment plant

Over the past 10 years, sewage treatment plants throughout Switzerland have implemented numerous energy-efficiency measures and thus cut their external electricity supply costs by an estimated 80 million kWh per annum. According to studies carried out by the Swiss Federal Office of Energy, approximately 50 million kWh p.a. originate from their own supplementary electricity production. The estimated savings effect of efficiency measures is around 30 million kWh p.a.

Energy analysis as the first step

The optimisation of a sewage treatment plant begins with an energy analysis. Approximately 200 sewage treatment plants in Switzerland have undergone an energy analysis within the scope of the "SwissEnergy for infrastructure plants" programme, and have subsequently implemented a variety of efficiency measures. An evaluation of more than 100 in-depth analyses resulted in the following findings:

  • Efficiency potentials exist in the majority of sewage treatment plants, and energy costs can be cut by up to 50 percent.
  • In most cases, the package of measures proposed as the result of an energy analysis gives rise to clear economic benefits.
  • Generally speaking, the costs associated with an energy analysis can be recovered in less than a year.

Related documents

Energy from sewage treatment plants
Contact: Ernst A. Müller
Last update: 03.09.2009


Ende Inhaltsbereich



Infoline Phone +41 52 238 34 34 Partners
Swiss Water Pollution Control Association (VSA)


Swiss Federal Office of Energy SFOE
Contact form | Legal basis
http://www.bfe.admin.ch/infrastrukturanlagen/01076/01137/index.html?lang=en